Pigment Plant Capital Improvement Projects

Tronox is a global vertically integrated producer of titanium dioxide and inorganic chemicals, which mines and processes titanium ore, zircon and other materials and manufactures titanium dioxide pigment, specialty-grade titanium dioxide products and high-purity titanium chemicals. CPC provides engineering services to Tronox’s West Australian region encompassing the mine (Cooljarloo), dry and synthetic rutile plant (Chandala) […]

Enterprise Nickel Concentrator

The 4.5 Mt/y Enterprise Nickel Project was developed alongside the 55 Mt/y Sentinel Copper Project and made extensive use of the existing copper facilities and infrastructure. The Enterprise plant was designed with considerable flexibility to allow it to treat ore from a variety of sources. The equipment sizing, and pipe configuration allows a choice of […]

Cowal Gold Project Flotation Tail Leach Project

During 2018, CPC completed a brownfields addition for Evolution Mining’s Cowal Project. A new leach circuit was installed, based on diagnostic leaching indicating that 60% of the flotation tails stream is amenable to direct cyanidation. This project included installation of a new 9.5Mt/a circuit to leach flotation tails and detoxification of this stream before pumping […]

Balama Graphite Project

CPC assisted Syrah Resources with the development of their Balama Graphite Project in Mozambique. CPC completed detailed engineering, procurement, construction support and commissioning services for the project. The processing facility at Balama will produce a dry graphite concentrate that is bagged and trucked off site. Six size fractions will be produced at the Balama concentrator […]