Enterprise Nickel Project
The 4.5 Mt/y Enterprise Nickel Project was developed alongside the 55 Mt/y Sentinel Copper Project and made extensive use of the existing copper facilities and infrastructure. The Enterprise plant was designed with considerable flexibility to allow it to treat ore from a variety of sources. The equipment sizing, and pipe configuration allows a choice of […]
Lanfranchi Paste Plant Extension
Lanfranchi Paste Plant Upgrade
Nova
Ravensthorpe Nickel Plant Refurbishment
Ravensthorpe Acid Leach Area Project
CPC completed the refurbishment of one complete atmospheric leach tank including engineering and construction activities at First Quantum’s Ravensthope Nickel Operation. Structural steel modifications to a further three tanks has also been completed. This project included the replacement of the acid resistant brick lining, repairs to the structural integrity of the tanks and finite element […]