St Barbara, Leonora, Underground Crushing and Paste Fill Plant
Engineering design and construction of a Paste Aggregate Fill (PAF) plant including civil, structural, mechanical, piping, electrical, instrumentation, and commissioning. The PAF was installed off the mine decline on Level 1420 level for the crushing plant and electrical equipment and on Level 1460 for the paste mixer.