Southern Ports Authority
Client: Southern Porth Authority
Location: Port of Albany
Commodity: Grain, Fertiliser, Silica sands,
Wood chips
Services: Berth 3 Soffit Remediation –
Structural Steel Works
Year: 2025/2026/2027
The project scope included:
Development of work methodology, including floating platform design, engineering, and installation
Encapsulation measures to protect the surrounding environment
Delivery of high-risk asset refurbishment works within an active export and receival facility
Surface treatment and associated electrical installations
Implementation of comprehensive QA/QC requirements, all undertaken in a challenging working environment
CPC Engineering was awarded the contract to deliver blasting and painting services to address the deterioration of the steel substrate at Berth 3, Port of Albany