Client: CBH Group – Esperance Zone
Location: Grass Patch, Western Australia
Commodity: Grain
Sector: Agriculture
Services: Construction / Fabrication
Year: 2026
CPC Engineering’s FY26 scope for the new grid and conveyor loading system (CLS) at CBH’s Grass Patch site covered the mechanical installation and commissioning of all required components. This included the sloping tail module, 55 kW drive module, gravity take-up and weights, conveyor stringers, all conveyor idlers, two trippers and all required guarding. It also included installing the conveyor belt and vulcanising the splice, and supplying and installing airline, fittings and outlets from the compressor to the conveyor drive end and grid hose reel. Adequate time and personnel were allowed for testing, tracking and commissioning, and CPC provided touch-up painting plus commissioning and construction QA and test sheets.