St. Barbara Limited, Western Australia, Gwalia PAF Plant
Design and construction of a Paste Aggregate Fill (PAF) plant including civil, structural, mechanical, piping, electrical, instrumentation, and commissioning. The PAF will be installed off the mine decline on 1420 level for crushing plant (Trio) and electrical equipment, on 1460 level paste mixer (Simem) and positive displacement pump (Geho).