AngloGold Ashanti, Sunrise Dam Con Leach Project
CPC Engineering successfully delivered the civil, structural, mechanical, piping and electrical scopes for the Con Leach Project at AngloGold Ashanti’s Sunrise Dam operation, located approximately 55 kilometres south of Laverton in Western Australia.
Following completion of the initial study phase and transition into detailed design, CPC progressed into construction delivery, supporting early works through the release of critical concrete and tank platework drawings. The project involved more than 5,000 cubic metres of earthworks, 700 cubic metres of concrete, 150 tonnes of platework, 100 tonnes of structural steel, 2.6 kilometres of piping, installation of approximately 300 valves, and 17 kilometres of cabling. At peak, approximately 50 personnel were mobilised on site.
Key milestones included completion of the concrete ring beams, tank fabrication, surface treatment works and final civil completion to support the installation of the remaining mechanical and electrical scope. Practical completion and water commissioning were achieved on schedule, with the project recording approximately 100,000 work hours without a lost time injury.
The successful delivery highlights CPC Engineering’s capability to execute complex, multi-disciplinary construction projects in remote operating environments, while maintaining a strong focus on safety, coordination and project performance.