AngloGold Ashanti engaged CPC to assist with the detailed design of their infrastructure for their Boston Shaker Project, which is an underground development to produce 1.3 Mt of ore per year with a mine life of 6 years, at their Tropicana mine site in Western Australia.
The scope of work included the following:
Subsequent to the design phase of the project, CPC has been awarded the Structural, Mechanical and Piping (SMP) underground construction works.